The muscle we forgot: SMRs, hyperscalers, and why this nuclear renaissance might actually be different

The muscle we forgot: SMRs, hyperscalers, and why this nuclear renaissance might actually be different

Why nuclear has never been project financed and how that might finally be about to change.

Every nuclear plant ever built has ultimately been backstopped by taxpayers or ratepayers. Not because the technology doesn't work, but because nobody has ever cracked the construction cost and schedule problem well enough to convince a bank to finance it without government support. Bridget van Dorsten is joined by Jake Jurewicz, Co-founder and CEO of Blue Energy, to explore why that has been so hard and what a credible path to fixing it might actually look like.

Jake walks through the root cause of nuclear's cost overrun problem and it is not the reactor. The reactor equipment itself represents around 7% of total project costs. The real problem is what Jake calls nuclear construction overhead: the cost of mobilizing, training, and retaining the 10,000 or so skilled workers needed to build these plants in the field, the way we have been building them for 70 years, essentially the same way you would build a castle.

The episode then turns to what Blue Energy is doing differently. By intentionally selecting sites accessible by barge and contracting existing oil and gas fabrication yards and shipyards to build large pre-assembled modules offsite, Blue Energy aims to bring fixed-price contracts into nuclear for the first time, the same contracting structure that made offshore wind and LNG bankable. Jake explains why that single shift changes everything for project financing.

Bridget and Jake also work through the demand side of the equation: why hyperscalers are becoming the crucial beachhead market for new nuclear, what binding PPAs from investment-grade counterparties actually signal versus announcements, and why the restarts and uprates, while valuable, only go so far.

The conversation also covers Blue Energy's first announced project at the Port of Victoria in Texas, a 1.5 gigawatt nuclear-powered AI data centre co-located with a gas-to-nuclear conversion, designed to accelerate commercial operation and reduce cost of capital even without government loan support. Jake explains the mechanics of why firing the balance of plant with gas first before switching to nuclear steam is not a compromise but a genuine financing innovation.

Finally, Jake offers a view of what signals actually matter when separating the nuclear renaissance from the noise: binding PPAs, large balance sheets standing behind fixed-price contracts, and projects moving through the Nuclear Regulatory Commission rather than staying at the prototype stage.

See Privacy Policy at https://art19.com/privacy and California Privacy Notice at https://art19.com/privacy#do-not-sell-my-info.

Jaksot(342)

The Interchange: Recharged - Live at Wood Mackenzie's CCUS Conference - Part 2

The Interchange: Recharged - Live at Wood Mackenzie's CCUS Conference - Part 2

Carbon capture, utilization and storage is evolving rapidly from a niche market to a mainstream investment theme. To explore the technology, financing and science behind this key piece of the energy t...

18 Loka 202338min

Electricity 4.0: A Sustainable, Resilient, and Efficient Future [Sponsored Content]

Electricity 4.0: A Sustainable, Resilient, and Efficient Future [Sponsored Content]

We’re facing a triple crisis: energy security, deadline for decarbonization and a fragile global economy. We’re at a pivotal moment where sustainable commitments can become a reality, now that technol...

17 Loka 202341min

The Interchange: Recharged - Live at Wood Mackenzie's CCUS Conference - Part 1

The Interchange: Recharged - Live at Wood Mackenzie's CCUS Conference - Part 1

Carbon Capture, Utilization and Storage is evolving rapidly from a niche market to a mainstream investment theme. To explore the technology, financing and science behind this key piece of the energy t...

13 Loka 202355min

Are PPAs Still Playing Their Part In The Expansion Of Solar?

Are PPAs Still Playing Their Part In The Expansion Of Solar?

Alight is a company riding the solar-coaster and enjoying the heights.In November 2021, we sat down with Harald Overholm, co-founder and CEO of Alight. The focus of that discussion was on the emergenc...

15 Syys 202345min

From Hours To Days - Reinventing Long-Duration Energy Storage

From Hours To Days - Reinventing Long-Duration Energy Storage

A new linear generator could be the answer to the risks of extreme weather.The prospect of an extended blackout during a heat wave is not only alarming, but a potential public health emergency. Accord...

1 Syys 202349min

Could Deep-Sea Mining Solve Our Critical Metals Dilemma?

Could Deep-Sea Mining Solve Our Critical Metals Dilemma?

280 million EV’s worth of battery material is sitting on the ocean floor, but do we need to mine it?The end is nigh for the internal combustion engine. Electric vehicles will be phased in across the n...

18 Elo 202350min

A Global Outlook For Local Solar Energy

A Global Outlook For Local Solar Energy

The energy transition can’t be solved simply by focusing on infrastructure, digital solutions or investment alone. These three parts of the puzzle need to fit together. The federal government recognis...

4 Elo 202339min

The Money Circuit – Where Are Banks Investing In Clean Energy?

The Money Circuit – Where Are Banks Investing In Clean Energy?

Back in May, we heard from two climate economists – Gernot Wagner and Bruce Usher, both from Columbia University. Together we explored the flow of capital going into the four largest sources of renewa...

21 Heinä 202341min

Suosittua kategoriassa Liike-elämä ja talous

sijotuskasti
psykopodiaa-podcast
mimmit-sijoittaa
rss-rahapodi
ostan-asuntoja-podcast
rss-rahamania
rss-sisalto-kuntoon
sijoituspodi
rahapuhetta
rss-karon-grilli
herrasmieshakkerit
rss-bisnesta-bebeja
rss-draivi
leadcast
rss-lahtijat
rss-laakispodi
rss-seuraava-potilas
rss-paasipodi
rss-yrittajan-mindset
asuntoasiaa-paivakirjat