The muscle we forgot: SMRs, hyperscalers, and why this nuclear renaissance might actually be different

The muscle we forgot: SMRs, hyperscalers, and why this nuclear renaissance might actually be different

Why nuclear has never been project financed and how that might finally be about to change.

Every nuclear plant ever built has ultimately been backstopped by taxpayers or ratepayers. Not because the technology doesn't work, but because nobody has ever cracked the construction cost and schedule problem well enough to convince a bank to finance it without government support. Bridget van Dorsten is joined by Jake Jurewicz, Co-founder and CEO of Blue Energy, to explore why that has been so hard and what a credible path to fixing it might actually look like.

Jake walks through the root cause of nuclear's cost overrun problem and it is not the reactor. The reactor equipment itself represents around 7% of total project costs. The real problem is what Jake calls nuclear construction overhead: the cost of mobilizing, training, and retaining the 10,000 or so skilled workers needed to build these plants in the field, the way we have been building them for 70 years, essentially the same way you would build a castle.

The episode then turns to what Blue Energy is doing differently. By intentionally selecting sites accessible by barge and contracting existing oil and gas fabrication yards and shipyards to build large pre-assembled modules offsite, Blue Energy aims to bring fixed-price contracts into nuclear for the first time, the same contracting structure that made offshore wind and LNG bankable. Jake explains why that single shift changes everything for project financing.

Bridget and Jake also work through the demand side of the equation: why hyperscalers are becoming the crucial beachhead market for new nuclear, what binding PPAs from investment-grade counterparties actually signal versus announcements, and why the restarts and uprates, while valuable, only go so far.

The conversation also covers Blue Energy's first announced project at the Port of Victoria in Texas, a 1.5 gigawatt nuclear-powered AI data centre co-located with a gas-to-nuclear conversion, designed to accelerate commercial operation and reduce cost of capital even without government loan support. Jake explains the mechanics of why firing the balance of plant with gas first before switching to nuclear steam is not a compromise but a genuine financing innovation.

Finally, Jake offers a view of what signals actually matter when separating the nuclear renaissance from the noise: binding PPAs, large balance sheets standing behind fixed-price contracts, and projects moving through the Nuclear Regulatory Commission rather than staying at the prototype stage.

See Privacy Policy at https://art19.com/privacy and California Privacy Notice at https://art19.com/privacy#do-not-sell-my-info.

Jaksot(342)

The Future of Community Solar

The Future of Community Solar

75% of American households do not have access to solar power. Residents that do not own their own home or who live in apartments are unable to host a solar system and reap the benefits. So, what’s the...

4 Maalis 202257min

Scalable Carbon Capture Technology - Putting a Price on Carbon

Scalable Carbon Capture Technology - Putting a Price on Carbon

The energy transition is an ‘all-hands-on-deck’ journey. As we know, there is no silver bullet or golden ticket that will get us to where we need to be. Just like our economy, it is compiled of comple...

18 Helmi 202256min

Quaise Energy Digs Deep - Into The World Of Geothermal

Quaise Energy Digs Deep - Into The World Of Geothermal

Geothermal technology is a hugely untapped sustainable energy source. In this episode of the Interchange: Recharged, we drill Carlos, the CEO of Quaise Energy, on all things geothermal and the opportu...

4 Helmi 202252min

Innovation And Data Are Revolutionizing The Grid

Innovation And Data Are Revolutionizing The Grid

America's energy transition is a complex and intricate process with a lot of moving parts. When discussing decarbonizing the globe, the electrical grid is usually overlooked and left out of the conver...

21 Tammi 202241min

A Conversation With Alight – The Commercial Side of Solar

A Conversation With Alight – The Commercial Side of Solar

On the Interchange this week, we are joined by Alight CEO and founder Dr Harald Overholm. Harald was previously a cleantech venture capitalist and an advisor on solar markets to the WWF and the Swedis...

23 Joulu 202151min

EVs in the US – Are We Lagging Behind?

EVs in the US – Are We Lagging Behind?

President Biden’s Build Back Better bill includes tax incentives for consumers to switch to electric vehicles, and a multi-billion dollar plan for charging stations and infrastructure. The intent is t...

10 Joulu 202155min

The Future of Solar Storage

The Future of Solar Storage

You can develop enough renewable energy to power the world, but without energy storage systems, those developments are rendered somewhat moot. To achieve President Biden’s target of 90% renewables by ...

26 Marras 202144min

Solar Power: The Silver Linings of Ditching Silver

Solar Power: The Silver Linings of Ditching Silver

Why wouldn’t everyone invest in solar? Well, for that reason exactly: it’s an investment. Although it’s praised for its low maintenance costs and long-term savings, it is still a hefty investment in t...

12 Marras 202147min

Suosittua kategoriassa Liike-elämä ja talous

sijotuskasti
mimmit-sijoittaa
psykopodiaa-podcast
rss-rahapodi
rss-sisalto-kuntoon
rss-rahamania
ostan-asuntoja-podcast
rahapuhetta
herrasmieshakkerit
sijoituspodi
rss-karon-grilli
leadcast
asuntoasiaa-paivakirjat
rss-lahtijat
rss-startup-ministerio
rss-paasipodi
rss-yrittajan-mindset
rss-draivi
pomojen-suusta
rss-valaistumisia-tyoelamasta