The muscle we forgot: SMRs, hyperscalers, and why this nuclear renaissance might actually be different

The muscle we forgot: SMRs, hyperscalers, and why this nuclear renaissance might actually be different

Why nuclear has never been project financed and how that might finally be about to change.

Every nuclear plant ever built has ultimately been backstopped by taxpayers or ratepayers. Not because the technology doesn't work, but because nobody has ever cracked the construction cost and schedule problem well enough to convince a bank to finance it without government support. Bridget van Dorsten is joined by Jake Jurewicz, Co-founder and CEO of Blue Energy, to explore why that has been so hard and what a credible path to fixing it might actually look like.

Jake walks through the root cause of nuclear's cost overrun problem and it is not the reactor. The reactor equipment itself represents around 7% of total project costs. The real problem is what Jake calls nuclear construction overhead: the cost of mobilizing, training, and retaining the 10,000 or so skilled workers needed to build these plants in the field, the way we have been building them for 70 years, essentially the same way you would build a castle.

The episode then turns to what Blue Energy is doing differently. By intentionally selecting sites accessible by barge and contracting existing oil and gas fabrication yards and shipyards to build large pre-assembled modules offsite, Blue Energy aims to bring fixed-price contracts into nuclear for the first time, the same contracting structure that made offshore wind and LNG bankable. Jake explains why that single shift changes everything for project financing.

Bridget and Jake also work through the demand side of the equation: why hyperscalers are becoming the crucial beachhead market for new nuclear, what binding PPAs from investment-grade counterparties actually signal versus announcements, and why the restarts and uprates, while valuable, only go so far.

The conversation also covers Blue Energy's first announced project at the Port of Victoria in Texas, a 1.5 gigawatt nuclear-powered AI data centre co-located with a gas-to-nuclear conversion, designed to accelerate commercial operation and reduce cost of capital even without government loan support. Jake explains the mechanics of why firing the balance of plant with gas first before switching to nuclear steam is not a compromise but a genuine financing innovation.

Finally, Jake offers a view of what signals actually matter when separating the nuclear renaissance from the noise: binding PPAs, large balance sheets standing behind fixed-price contracts, and projects moving through the Nuclear Regulatory Commission rather than staying at the prototype stage.

See Privacy Policy at https://art19.com/privacy and California Privacy Notice at https://art19.com/privacy#do-not-sell-my-info.

Jaksot(342)

Pathways to Transforming Heavy Industry

Pathways to Transforming Heavy Industry

There are few areas harder to decarbonize than heavy industry. But the stakes are high. Altogether, industry represents over 30% of global GHG emissions, when counting both direct process emissions an...

29 Huhti 20211h

Where Will Big Money Be Made in Climate Tech?

Where Will Big Money Be Made in Climate Tech?

There’s money to be made in climate tech, broadly defined. But where exactly?As investment pours into climate tech, it’s true that a rising tide lifts all boats. But in markets -- especially fast-chan...

23 Huhti 202157min

An Island’s Path to 100% Renewables [Special Content From Wärtsilä]

An Island’s Path to 100% Renewables [Special Content From Wärtsilä]

The grid of the future lies 850 miles off the coast of Portugal, on an island in the Azores called Graciosa.The island has always been dependent on fossil fuels. But in 2018, that changed. That’s when...

20 Huhti 202120min

Can Computers and Math Save the Climate? (Rebroadcast)

Can Computers and Math Save the Climate? (Rebroadcast)

This week: artificial intelligence, machine learning, and the many ways they can decarbonize the economy.From optimizing buildings to modeling new industrial processes to better managing the grid, AI ...

15 Huhti 202150min

The Magnitude of 24/7 Zero-Carbon Energy

The Magnitude of 24/7 Zero-Carbon Energy

In 2017, Google became the first major company to reach 100% renewable energy through corporate renewables procurement. But it was also the first major company to acknowledge that 100% renewable is no...

8 Huhti 202147min

Why We Underestimate Clean Energy Cost Declines

Why We Underestimate Clean Energy Cost Declines

In 2010, solar modules cost a little over $2 per watt. Many people questioned whether solar costs could come down another 50%.Well, here we are today with solar modules well below 50 cents per watt, f...

1 Huhti 202136min

Oil Majors in a Post-Covid World

Oil Majors in a Post-Covid World

The oil majors are slowly recognizing that in a decarbonized world their fundamental business is going to have to change. So what are they thinking? Where are they deploying resources -- and not deplo...

26 Maalis 202141min

What Does a 'Climate Resilience Director' Do?

What Does a 'Climate Resilience Director' Do?

Heather Rock joined PG&E as director of climate resilience in 2018 -- just two weeks before a faulty PG&E line sparked the most destructive wildfire in U.S. history. It’s hard to imagine a more compli...

18 Maalis 202132min

Suosittua kategoriassa Liike-elämä ja talous

sijotuskasti
mimmit-sijoittaa
psykopodiaa-podcast
rss-rahapodi
rss-sisalto-kuntoon
rss-rahamania
ostan-asuntoja-podcast
herrasmieshakkerit
rahapuhetta
sijoituspodi
rss-lahtijat
rss-karon-grilli
oppimisen-psykologia
lakicast
rss-startup-ministerio
rss-bisnesta-bebeja
rss-paasipodi
rss-yrittajan-mindset
rss-viisas-raha-podi
rss-draivi