The muscle we forgot: SMRs, hyperscalers, and why this nuclear renaissance might actually be different

The muscle we forgot: SMRs, hyperscalers, and why this nuclear renaissance might actually be different

Why nuclear has never been project financed and how that might finally be about to change.

Every nuclear plant ever built has ultimately been backstopped by taxpayers or ratepayers. Not because the technology doesn't work, but because nobody has ever cracked the construction cost and schedule problem well enough to convince a bank to finance it without government support. Bridget van Dorsten is joined by Jake Jurewicz, Co-founder and CEO of Blue Energy, to explore why that has been so hard and what a credible path to fixing it might actually look like.

Jake walks through the root cause of nuclear's cost overrun problem and it is not the reactor. The reactor equipment itself represents around 7% of total project costs. The real problem is what Jake calls nuclear construction overhead: the cost of mobilizing, training, and retaining the 10,000 or so skilled workers needed to build these plants in the field, the way we have been building them for 70 years, essentially the same way you would build a castle.

The episode then turns to what Blue Energy is doing differently. By intentionally selecting sites accessible by barge and contracting existing oil and gas fabrication yards and shipyards to build large pre-assembled modules offsite, Blue Energy aims to bring fixed-price contracts into nuclear for the first time, the same contracting structure that made offshore wind and LNG bankable. Jake explains why that single shift changes everything for project financing.

Bridget and Jake also work through the demand side of the equation: why hyperscalers are becoming the crucial beachhead market for new nuclear, what binding PPAs from investment-grade counterparties actually signal versus announcements, and why the restarts and uprates, while valuable, only go so far.

The conversation also covers Blue Energy's first announced project at the Port of Victoria in Texas, a 1.5 gigawatt nuclear-powered AI data centre co-located with a gas-to-nuclear conversion, designed to accelerate commercial operation and reduce cost of capital even without government loan support. Jake explains the mechanics of why firing the balance of plant with gas first before switching to nuclear steam is not a compromise but a genuine financing innovation.

Finally, Jake offers a view of what signals actually matter when separating the nuclear renaissance from the noise: binding PPAs, large balance sheets standing behind fixed-price contracts, and projects moving through the Nuclear Regulatory Commission rather than staying at the prototype stage.

See Privacy Policy at https://art19.com/privacy and California Privacy Notice at https://art19.com/privacy#do-not-sell-my-info.

Jaksot(342)

Climate Risk, Part 1: How Do We Measure It?

Climate Risk, Part 1: How Do We Measure It?

This week, we present the first episode in our 3-part interview series on climate risk. How do we measure and quantify both the physical and economic risk of a warming planet?This question has very re...

30 Loka 201949min

The Internet-of-Things Promise in Buildings [Special Content From Centrica]

The Internet-of-Things Promise in Buildings [Special Content From Centrica]

This week, we present a special episode in collaboration with Centrica Business Solutions and GTM Creative Strategies.For the last decade and a half, we’ve been hearing about how the internet-of-thing...

30 Loka 201928min

3 Barometers of the Energy Transition

3 Barometers of the Energy Transition

This week: three barometers of the energy transition. There are a lot of numbers flying at us every day — and it is our job to figure what they indicate about change. In this episode, we’ll choose thr...

24 Loka 201924min

Can Venture Capital Make America Do Tough Things Again?

Can Venture Capital Make America Do Tough Things Again?

Could you do us a favor? Take our listener survey so we can give you more relevant content: bit.ly/gtmpodcastVenture capital is an effective source of money for scaling companies quickly. But what if ...

18 Loka 201939min

What’s Driving the Residential Battery Surge?

What’s Driving the Residential Battery Surge?

The market for home batteries is picking up.Residential storage capacity installations outpaced utility-scale installations in the second quarter of this year. There were more residential batteries in...

7 Loka 201948min

The Stranded Asset Threat to Natural Gas

The Stranded Asset Threat to Natural Gas

There are $70 billion worth of natural gas-fired power plants planned in the U.S. through the mid 2020s. But a combination of wind, solar, batteries and demand-side management could threaten 90 percen...

27 Syys 201941min

The Age of 100%

The Age of 100%

We are now in a new age for clean energy: the age of 100%.Every week, we get some new declaration from a corporation, a city, a state or a utility that they are going 100%.But not all targets are crea...

20 Syys 201946min

Tesla’s Solar Gigafactory Struggles

Tesla’s Solar Gigafactory Struggles

New York State offered Tesla $750 million to turn Buffalo into a solar manufacturing hub — why hasn’t Tesla delivered on the vision it promised?It’s been five years since SolarCity first declared plan...

10 Syys 201953min

Suosittua kategoriassa Liike-elämä ja talous

sijotuskasti
psykopodiaa-podcast
mimmit-sijoittaa
rss-rahapodi
ostan-asuntoja-podcast
rss-rahamania
rss-sisalto-kuntoon
sijoituspodi
rahapuhetta
rss-karon-grilli
herrasmieshakkerit
rss-bisnesta-bebeja
rss-draivi
leadcast
rss-lahtijat
rss-laakispodi
rss-seuraava-potilas
rss-paasipodi
rss-yrittajan-mindset
asuntoasiaa-paivakirjat