The muscle we forgot: SMRs, hyperscalers, and why this nuclear renaissance might actually be different

The muscle we forgot: SMRs, hyperscalers, and why this nuclear renaissance might actually be different

Why nuclear has never been project financed and how that might finally be about to change.

Every nuclear plant ever built has ultimately been backstopped by taxpayers or ratepayers. Not because the technology doesn't work, but because nobody has ever cracked the construction cost and schedule problem well enough to convince a bank to finance it without government support. Bridget van Dorsten is joined by Jake Jurewicz, Co-founder and CEO of Blue Energy, to explore why that has been so hard and what a credible path to fixing it might actually look like.

Jake walks through the root cause of nuclear's cost overrun problem and it is not the reactor. The reactor equipment itself represents around 7% of total project costs. The real problem is what Jake calls nuclear construction overhead: the cost of mobilizing, training, and retaining the 10,000 or so skilled workers needed to build these plants in the field, the way we have been building them for 70 years, essentially the same way you would build a castle.

The episode then turns to what Blue Energy is doing differently. By intentionally selecting sites accessible by barge and contracting existing oil and gas fabrication yards and shipyards to build large pre-assembled modules offsite, Blue Energy aims to bring fixed-price contracts into nuclear for the first time, the same contracting structure that made offshore wind and LNG bankable. Jake explains why that single shift changes everything for project financing.

Bridget and Jake also work through the demand side of the equation: why hyperscalers are becoming the crucial beachhead market for new nuclear, what binding PPAs from investment-grade counterparties actually signal versus announcements, and why the restarts and uprates, while valuable, only go so far.

The conversation also covers Blue Energy's first announced project at the Port of Victoria in Texas, a 1.5 gigawatt nuclear-powered AI data centre co-located with a gas-to-nuclear conversion, designed to accelerate commercial operation and reduce cost of capital even without government loan support. Jake explains the mechanics of why firing the balance of plant with gas first before switching to nuclear steam is not a compromise but a genuine financing innovation.

Finally, Jake offers a view of what signals actually matter when separating the nuclear renaissance from the noise: binding PPAs, large balance sheets standing behind fixed-price contracts, and projects moving through the Nuclear Regulatory Commission rather than staying at the prototype stage.

See Privacy Policy at https://art19.com/privacy and California Privacy Notice at https://art19.com/privacy#do-not-sell-my-info.

Jaksot(341)

Is Trump Saving Coal?

Is Trump Saving Coal?

When President Trump took office, U.S. coal was in a state of decline. Between 2007 and 2016, coal production and consumption each fell by more than a third, and mining jobs fell from 125,000 to 75,00...

12 Tammi 201852min

Watt It Takes: The Origin Story of Greentech Media

Watt It Takes: The Origin Story of Greentech Media

We spend most of our time talking about other companies. For our first podcast of the year, we're turning the tables and reflecting on GTM.In this edition of Watt It Takes, Powerhouse CEO Emily Kirsch...

2 Tammi 201857min

Rebuilding Puerto Rico With Solar and Batteries

Rebuilding Puerto Rico With Solar and Batteries

Three months after Hurricane Maria, there are still large swaths of Puerto Rico that don’t have power. It took two months to get half the island’s residents power again -- and hundreds of thousands of...

22 Joulu 201759min

Energy Storage Has Arrived

Energy Storage Has Arrived

Energy storage has arrived. This year brought numerous record-breaking battery projects, dozens of acquisitions and partnerships, and over a dozen utility integrated resource plans that factor storage...

14 Joulu 20171h 18min

The Conservative and Progressive View on the Future of Electricity Markets

The Conservative and Progressive View on the Future of Electricity Markets

Something feels different. In the last two years, there’s been a material shift in the way renewable energy and other distributed resources are discussed.For so long, believers of wind, solar, batteri...

5 Joulu 20171h 14min

Tesla's Giant Battery: Pros and Cons

Tesla's Giant Battery: Pros and Cons

Tesla built the world's biggest lithium-ion battery ahead of schedule. It's an important milestone for the technology, and Tesla itself. But is it coming at a cost to smaller players in the industry?T...

1 Joulu 201755min

Dan Shugar, the King Midas of Solar

Dan Shugar, the King Midas of Solar

Dan Shugar lives, breathes and bleeds solar. "If you cut my wrist, pure silicon comes out," he exclaimed in an interview with Powerhouse CEO Emily Kirsch, as part of the Watt It Takes interview series...

22 Marras 20171h

Collision Course: How Wind and Solar Are Disrupting Power Markets

Collision Course: How Wind and Solar Are Disrupting Power Markets

We've spent a lot more time lately looking at the structure of U.S. power markets. Why? Because they're about to get shaken up.It's already begun. In this episode, we'll look at how renewables are upe...

16 Marras 201733min

Suosittua kategoriassa Liike-elämä ja talous

sijotuskasti
mimmit-sijoittaa
psykopodiaa-podcast
rss-rahapodi
rss-rahamania
ostan-asuntoja-podcast
rahapuhetta
rss-laakispodi
rss-sisalto-kuntoon
herrasmieshakkerit
sijoituspodi
rss-draivi
inderespodi
rss-sami-miettinen-neuvottelija
rss-lahtijat
rss-bisnesta-bebeja
rss-karon-grilli
rss-seuraava-potilas
rss-paasipodi
vapauta-supervoimasi-podcast