The muscle we forgot: SMRs, hyperscalers, and why this nuclear renaissance might actually be different

The muscle we forgot: SMRs, hyperscalers, and why this nuclear renaissance might actually be different

Why nuclear has never been project financed and how that might finally be about to change.

Every nuclear plant ever built has ultimately been backstopped by taxpayers or ratepayers. Not because the technology doesn't work, but because nobody has ever cracked the construction cost and schedule problem well enough to convince a bank to finance it without government support. Bridget van Dorsten is joined by Jake Jurewicz, Co-founder and CEO of Blue Energy, to explore why that has been so hard and what a credible path to fixing it might actually look like.

Jake walks through the root cause of nuclear's cost overrun problem and it is not the reactor. The reactor equipment itself represents around 7% of total project costs. The real problem is what Jake calls nuclear construction overhead: the cost of mobilizing, training, and retaining the 10,000 or so skilled workers needed to build these plants in the field, the way we have been building them for 70 years, essentially the same way you would build a castle.

The episode then turns to what Blue Energy is doing differently. By intentionally selecting sites accessible by barge and contracting existing oil and gas fabrication yards and shipyards to build large pre-assembled modules offsite, Blue Energy aims to bring fixed-price contracts into nuclear for the first time, the same contracting structure that made offshore wind and LNG bankable. Jake explains why that single shift changes everything for project financing.

Bridget and Jake also work through the demand side of the equation: why hyperscalers are becoming the crucial beachhead market for new nuclear, what binding PPAs from investment-grade counterparties actually signal versus announcements, and why the restarts and uprates, while valuable, only go so far.

The conversation also covers Blue Energy's first announced project at the Port of Victoria in Texas, a 1.5 gigawatt nuclear-powered AI data centre co-located with a gas-to-nuclear conversion, designed to accelerate commercial operation and reduce cost of capital even without government loan support. Jake explains the mechanics of why firing the balance of plant with gas first before switching to nuclear steam is not a compromise but a genuine financing innovation.

Finally, Jake offers a view of what signals actually matter when separating the nuclear renaissance from the noise: binding PPAs, large balance sheets standing behind fixed-price contracts, and projects moving through the Nuclear Regulatory Commission rather than staying at the prototype stage.

See Privacy Policy at https://art19.com/privacy and California Privacy Notice at https://art19.com/privacy#do-not-sell-my-info.

Episoder(342)

Damn, Commercial Solar Is Hard

Damn, Commercial Solar Is Hard

This week on The Interchange, a listener tries to convince his office building owner to install solar: "he's open to the idea, but we're struggling with the question of who pays," says Daniel from Men...

8 Mai 201829min

Batteries Are Changing Residential Solar

Batteries Are Changing Residential Solar

The solar industry is talking about battery storage almost as much as solar these days.On this week's Interchange, we're addressing the shift toward storage in residential solar. Sunrun, a top install...

4 Mai 201838min

European Solar Rises Again, With Fewer Subsidies

European Solar Rises Again, With Fewer Subsidies

Europe was once the world's biggest solar spender, until the region's PV market fell into a structural decline after subsidies were pulled back. Now Europe is on the upswing once again — this time, wi...

24 Apr 201832min

Shell Thinks Solar Could Beat Oil & Gas

Shell Thinks Solar Could Beat Oil & Gas

Shell, the world’s sixth biggest oil and gas company, just published a future "sky" scenario that's getting a lot of attention. That potential future: By 2050, renewables could overtake oil, gas and c...

17 Apr 201831min

What Will Energy Blockchain Become?

What Will Energy Blockchain Become?

Blockchain is largely untested compared to its potential. We know it’s likely transformative — we just don’t know exactly how.There are hundreds of potential applications in the electricity business. ...

11 Apr 201853min

How Blockchain Peer-to-Peer Energy Trading Might Work

How Blockchain Peer-to-Peer Energy Trading Might Work

Out of the 122 startups (and counting) that GTM Research is tracking in the energy-blockchain space, 22 are focused on peer-to-peer energy trading.Sharing electrons directly with peers sounds cool, bu...

3 Apr 201846min

Gina McCarthy

Gina McCarthy

Gina McCarthy isn't happy watching Scott Pruitt dismantle the climate plan that she helped President Obama build. But she doesn't think Pruitt will be successful."They've made a lot of announcements, ...

27 Mar 201843min

Solar's Tough Year

Solar's Tough Year

Last year was a tough one for many U.S. solar companies. For the first time, America's solar market saw a decline in growth and solar employment.What gives? In this podcast, we're going to walk throug...

21 Mar 201847min

Populært innen Business og økonomi

stopp-verden
dine-penger-pengeradet
lydartikler-fra-aftenposten
e24-podden
rss-penger-polser-og-politikk
rss-borsmorgen-okonominyhetene
pengepodden-2
finansredaksjonen
tid-er-penger-en-podcast-med-peter-warren
utbytte
rss-markedspuls-2
liberal-halvtime
pengesnakk
livet-pa-veien-med-jan-erik-larssen
morgenkaffen-med-finansavisen
rss-pa-konto
lederpodden
rss-fa-makro
rss-investering-gjort-enkelt
rss-politisk-preik